On the Critical Path (1971)

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Genre: Documentary
Runtime: 22 min
Release Date:
Production: ONF | NFB
Country: Canada
Language: English
Original Language: en

Keywords

nuclear power, candu

More Films in Genre: Documentary

Frequently Asked Questions

What is On the Critical Path about?
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
How long is On the Critical Path?
On the Critical Path has a runtime of 22m (22 minutes).
What genre is On the Critical Path?
On the Critical Path is a Documentary film.
Where was On the Critical Path produced?
On the Critical Path was produced in Canada.