Wastewater (2014)
The North Toronto Wastewater Treatment Plant lies in thick brush downhill from a hydroelectric corridor. The eye bounces, guided by the vertical forms coming up out of the valley, and a low flame bridges these movements.
Director: Stephen Broomer
Runtime: 1 min
Release Date: April 20, 2014
Original Language: en
More Films by Director: Stephen Broomer
Frequently Asked Questions
- What is Wastewater about?
- The North Toronto Wastewater Treatment Plant lies in thick brush downhill from a hydroelectric corridor. The eye bounces, guided by the vertical forms coming up out of the valley, and a low flame bridges these movements.
- Who directed Wastewater?
- Wastewater was directed by Stephen Broomer.
- How long is Wastewater?
- Wastewater has a runtime of 1m (1 minutes).